Value | Category | Cases | |
---|---|---|---|
Construction issues | 1 |
3.7%
|
|
Electricity power outages | 1 |
3.7%
|
|
Infrastructure Distractions due to Human beings themselves | 1 |
3.7%
|
|
Kuchakaa kwa Miundo mbinu ya maji kama mabomba yanayotumika kusambaza maji,kupasuka kwa mabomba ya maji | 1 |
3.7%
|
|
Kurekebisha miundo mbinu | 1 |
3.7%
|
|
Low supply of water | 2 |
7.4%
|
|
Maintainance | 2 |
7.4%
|
|
Maintanence | 1 |
3.7%
|
|
Maintanence and landslide | 1 |
3.7%
|
|
Maintenance | 6 |
22.2%
|
|
Miundombinu mibovu | 1 |
3.7%
|
|
Poor infrastructure | 1 |
3.7%
|
|
Poor system from the sources | 1 |
3.7%
|
|
Power outages | 1 |
3.7%
|
|
Problems on the supply pipes | 1 |
3.7%
|
|
Repairing of the pipes | 1 |
3.7%
|
|
Repairings of the pipes | 1 |
3.7%
|
|
Repairs of water infrastructure | 1 |
3.7%
|
|
Umeme ukikatika | 1 |
3.7%
|
|
Water Pumps Maintenance | 1 |
3.7%
|