Value | Category | Cases | |
---|---|---|---|
Local materials (i.e., thatched mud house, wood) | 5992 |
72%
|
|
Permanent/fixed structure (i.e., cement, bricks) | 1200 |
14.4%
|
|
Semi-permanent structure (mix of pemanent and local materials) | 1128 |
13.6%
|