IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2009-2017-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2009-2023

Sierra Leone, 2008 - 2023
Get Microdata
Reference ID
SLE_2009-2017-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 29, 2025
Last modified
Jan 29, 2025
Page views
7965
Downloads
260
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Sierra
    Leone_2009_2017_2023.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Sierra Leone_2009_2017_2023.dta

Overview

Valid: 75
Invalid: 436
Minimum: -9
Maximum: 366
Type: Discrete
Decimal: 0
Start: 1740
End: 1742
Width: 3
Range: -9 - 366
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
2.7%
-6 Still in process 7
9.3%
-5 Application denied 5
6.7%
1 One day or less 2
2.7%
2 4
5.3%
3 2
2.7%
4 2
2.7%
5 2
2.7%
6 1
1.3%
7 10
13.3%
8 1
1.3%
12 4
5.3%
14 11
14.7%
15 2
2.7%
17 1
1.3%
20 2
2.7%
21 4
5.3%
22 1
1.3%
30 10
13.3%
65 1
1.3%
366 1
1.3%
Sysmiss 436
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.