IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2009-2017-2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2009-2023

Sierra Leone, 2008 - 2023
Get Microdata
Reference ID
SLE_2009-2017-2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 29, 2025
Last modified
Jan 29, 2025
Page views
7983
Downloads
260
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Sierra
    Leone_2009_2017_2023.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Sierra Leone_2009_2017_2023.dta

Overview

Valid: 77
Invalid: 434
Minimum: -6
Maximum: 120
Type: Discrete
Decimal: 0
Start: 578
End: 580
Width: 3
Range: -6 - 120
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 4
5.2%
-5 Application denied 0
0%
1 One day or less 6
7.8%
2 3
3.9%
3 3
3.9%
4 1
1.3%
5 5
6.5%
6 4
5.2%
7 16
20.8%
8 2
2.6%
9 2
2.6%
10 4
5.2%
12 3
3.9%
13 1
1.3%
14 9
11.7%
15 1
1.3%
21 5
6.5%
24 1
1.3%
30 5
6.5%
120 2
2.6%
Sysmiss 434
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.