IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BFA_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Burkina Faso, 2024 - 2025
Get Microdata
Reference ID
BFA_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 15, 2025
Last modified
May 15, 2025
Page views
78
Downloads
2
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BurkinaFaso-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: BurkinaFaso-2024-full-data.dta

Overview

Valid: 25
Invalid: 355
Minimum: -6
Maximum: 75
Type: Discrete
Decimal: 0
Start: 145
End: 146
Width: 2
Range: -6 - 75
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 4
16%
-5 Application denied 0
0%
1 One day or less 1
4%
2 1
4%
6 1
4%
7 5
20%
10 2
8%
21 2
8%
24 1
4%
30 5
20%
48 2
8%
75 1
4%
Sysmiss 355
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.