IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LAO_2012_ES_V01_M / variable [F2]
central

Enterprise Survey 2012

Lao PDR, 2012
Get Microdata
Reference ID
LAO_2012_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jul 10, 2013
Last modified
Mar 29, 2019
Page views
23728
Downloads
1175
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Laos-2012-full
    data-

In fiscal year 2011, what the actual use of the resources as a percent of the (f1)

Data file: Laos-2012-full data-

Overview

Valid: 108
Invalid: 271
Type: Discrete
Decimal: 0
Start: 1047
End: 1049
Width: 3
Range: -
Format:

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now change the topic.
Literal question
In fiscal year 2011, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category
-9 do not know spontaneous
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
46 46
47 47
48 48
49 49
50 50
51 51
52 52
53 53
54 54
55 55
56 56
57 57
58 58
59 59
60 60
61 61
62 62
63 63
64 64
65 65
66 66
67 67
68 68
69 69
70 70
71 71
72 72
73 73
74 74
75 75
76 76
77 77
78 78
79 79
80 80
81 81
82 82
83 83
84 84
85 85
86 86
87 87
88 88
89 89
90 90
91 91
92 92
93 93
94 94
95 95
96 96
97 97
98 98
99 99
100 100
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.