IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LAO_2012_ES_V01_M / variable [F2]
central

Enterprise Survey 2012

Lao PDR, 2012
Get Microdata
Reference ID
LAO_2012_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jul 10, 2013
Last modified
Mar 29, 2019
Page views
23749
Downloads
1175
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Laos-2012-full
    data-

And if it had to buy the land and buildings in use now, as they are in thei (n7b)

Data file: Laos-2012-full data-

Overview

Valid: 107
Invalid: 272
Minimum: -9
Maximum: 240000000000
Mean: 5921814948.729
Standard deviation: 25646192412.184
Type: Continuous
Decimal: 0
Start: 1373
End: 1384
Width: 12
Range: -
Format:

Questions and instructions

Literal question
Hypothetically, if this establishment were to purchase the assets it uses now, in their current condition, how much would they cost?
Land and buildings
Interviewer instructions
This question is designed to ascertain the market value of the establishment's assets. Data on equipment is the most important. You can ask the manager to estimate the market value if all of the equipment, land and buildings were sold on the open market. If the respondent states that there is no market, ask how much the respondent would be willing to pay for the capital, knowing what it can produce in its current condition. Estimate how much it would cost to buy machinery in the current market which is similar in terms of age and characteristics. This estimate is to give an indication of the capital intensity of the firm. Keep in mind that it is one of the most important questions on the questionnaire.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.