IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ETH_2011_ES_V01_M / variable [F1]
central

Enterprise Survey 2011

Ethiopia, 2011 - 2012
Get Microdata
Reference ID
ETH_2011_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 12, 2013
Last modified
Mar 29, 2019
Page views
25484
Downloads
4079
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Ethiopia-2011-full
    data-

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Ethiopia-2011-full data-

Overview

Valid: 276
Invalid: 368
Type: Discrete
Decimal: 0
Start: 138
End: 139
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year 2010, did this establishment experience insufficient water supply for production?
Categories
Value Category
-9 do not know
1 yes
2 no
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.