IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_1983_PODES_V01_M / variable [F1]
central

Village Potential Survey 1983

Indonesia, 1983
Reference ID
IDN_1983_PODES_v01_M
Producer(s)
Central Bureau of Statistics
Metadata
DDI/XML JSON
Created on
Feb 19, 2014
Last modified
Mar 29, 2019
Page views
18980
Downloads
599
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • podes83a

Project duration (months) (b22_2b44)

Data file: podes83a

Overview

Valid: 828
Invalid: 63610
Minimum: 1
Maximum: 99
Type: Continuous
Decimal: 0
Start: 1209
End: 1210
Width: 2
Range: -
Format:

Questions and instructions

Literal question
If ‘yes : b. Not yet completed : Project duration (months)

Description

Definition
If there is physical development in fiscal year 1982-1983 (detail 1 coded 1), then write a description of the development of differentiated between the already and the not yet finished.
b. Unfinished construction;
Only asked for developments that are managed by rural / urban.
columns 2 & 3: Same as point 'a'
column 4: Fill in the length done (which is already implemented) for each type of development
column 5: Fill in the percentage of buildings that have been completed. Stuffing in integers.
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.