IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Bosnia and Herzegovina, 2012 - 2013
Get Microdata
Reference ID
BIH_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
May 19, 2014
Last modified
Mar 29, 2019
Page views
16486
Downloads
2524
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • BosniaandHerzegovina-2013-full
    data

Total costs of electricity (LCU) (n2b)

Data file: BosniaandHerzegovina-2013-full data

Overview

Valid: 360
Invalid: 0
Type: Discrete
Decimal: 0
Start: 1251
End: 1257
Width: 7
Range: -
Format:

Questions and instructions

Literal question
For fiscal year [insert last complete fiscal year], please provide the following information about this establishment:
Total annual costs of electricity
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
0
500
585
924
960
1000
1123
1200
1400
1450
1500
1610
1700
1800
2000
2445
2500
2600
2759
3000
3177
3500
3578
3700
4000
4153
4412
4500
4800
5000
5500
6000
6500
7000
7200
7389
7500
8000
8500
9000
9400
10000
10500
11000
12000
12483
13000
13700
14000
14500
15000
15380
17567
18000
18500
19200
20000
20391
21000
21600
22000
23842
24000
24500
25000
30000
30800
31000
32000
36000
40000
42000
43000
44077
50000
55000
55826
60000
70000
70256
75000
80000
88000
99900
100000
109000
116000
120000
123824
140000
150000
180000
200000
210000
216000
240000
246962
300000
400000
460000
480000
500000
600000
700000
1000000
1500000
2000000
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.