Value |
Category |
Business pemises i.e. bookstores have been renovated and modernly equipped; customers self service. We have introduced own transport and new computers i.e. cash registers |
|
Does not apply |
|
Don't know |
|
New module for clients wich is engaged in transportation that allows monitoring of vehicle efficiency (profitability) |
|
New program that is adjusted to the company |
|
No answer |
|
PRINT systems reduce expenses in production of business documents |
|
a new method of delivery |
|
a new way of constrcution of buildings |
|
a new way of processing of marble through casting |
|
additional services improved by introducing assembly teams, improved quality provided by modern equipment, introduction of product modification for better approach to the target group |
|
cable internet service through doxcis 3.0 system |
|
chemical process of plastic coating |
|
construction of buildings and prefabricated buildings |
|
construction works using newest types of bricks-better quality of the final product |
|
cooling of production machines |
|
customer support, security - quality guarantees for purchased materials |
|
customs clearance of cars (detention in the rolling stock, processing) |
|
delivery and installation of hydropower plants (with lower energy consumption) |
|
device that provides faster, more efficient and more accurate vehicle diagnostics |
|
devices that facilitate the work, requires more knowledge, but mainly much eassyer way to get perfect raw materials and materials. |
|
faster and easier access in search of literature and magazines |
|
fiscal accounts (programs) for fiscalization, available to all customers when installing the software |
|
food from the fryer |
|
free measuring of blood pressure, blood sugar, density of bone marrow |
|
free shipping |
|
ice cream production using new technology |
|
increased number of employees in production of butcher papaer with new operations at the machine |
|
installation of machinery that require lower electric power consumption, and they are much more productive than the old ones |
|
introduction of new machine for productioon of sweaters |
|
introduction of online sale of tickets and fiscal (tax) collection system. |
|
laboratory testing was earlier taking years, based on that we have purchased machinery for production of that product |
|
legalized packaging |
|
line for aluminum protecting- engraving |
|
logistics |
|
machines for increase of production capacity |
|
machines for production of concrete products |
|
maintenance of roads (it's just an extension of business) |
|
making of apothecary products, improvement of customer service |
|
method for fixing the chimney segments |
|
modern line for production of prefabricated houses Large panel |
|
modern machines and better organization of work, and fast production |
|
more detailed and faster diagnosis for cars |
|
new and modern machines for milk production |
|
new circular saw |
|
new circular saws for production |
|
new circular saws for production of laminate flooring |
|
new coffee roaster machines |
|
new components that work more effectively |
|
new design of books |
|
new energy value, accessories for triple glazing |
|
new funds for distribution |
|
new machine and new software for organization of production |
|
new machine for production |
|
new machine for dental impressions |
|
new machine, new technology |
|
new machinery and equipment-rental machines |
|
new machinery for production and sewing |
|
new machines and higher capacity and improved efficency |
|
new machines for casting of iron |
|
new machines, rapid production that allows lower prices |
|
new materials and structures, new shape with new machines |
|
new methods for easier engine design |
|
new methods in production of bread and bakery products |
|
new printing services |
|
new sewing machine |
|
new tehnology for processing and production |
|
new type of juice-cheaper to produce (new machines were used) |
|
new ways of dough mixing, new faster mixer for mixing |
|
new ways of transport |
|
nodular casting (nodular casting), material saving method |
|
production of aluminum castings using the method of discharge hopper, full machining, laminating or painting |
|
production of beechwood chair |
|
purchase of vehicles for transport own transport, supply of accounting systems, new softwares |
|
purchased new excavators and trucks and towing trucks |
|
reducing the labor time units for products, decreased energy consumption |
|
respondent does not know the answer |
|
sale with bonuses - presents are being given to buyers when spending more than certain amount |
|
service car wash |
|
services of CMC processing of materials and curvilinear forming and cutting |
|
some changes in the production process as a result of product quality monitoring |
|
system of distribution of hot and cold beverages |
|
water printing |
|
we have bought new machines thatr have improved the production process |
|
work on CNC machines, imported from Germany |
|
work with the new, modern machines, delivery contract within 24 hours |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.