IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TZA_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Tanzania, 2013 - 2014
Get Microdata
Reference ID
TZA_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
May 19, 2014
Last modified
Mar 29, 2019
Page views
15056
Downloads
1835
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Tanzania-2013-full
    data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Tanzania-2013-full data

Overview

Valid: 52
Invalid: 671
Type: Discrete
Decimal: 0
Start: 185
End: 187
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 DK
-6 Still in process
-5 Application denied
1 Less than one day
2
4
7
14
21
30
35
40
60
70
90
120
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.