IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PER_2011_L2L_V01_M / variable [F3]
central

The World Bank Listening to LAC (L2L) Pilot 2011

Peru, 2011 - 2012
Get Microdata
Reference ID
PER_2011_L2L_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
23895
Downloads
5551
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • World_Bank_Peru_L2L_HH_Roster
  • World_Bank_Peru_L2L_HH_All_Modes

Q26 [Enaho 102A-3]. Three years ago the main material on the external walls in your house was (Q26)

Data file: World_Bank_Peru_L2L_HH_All_Modes

Overview

Valid: 1658
Invalid: 0
Type: Discrete
Decimal: 0
Start: 188
End: 189
Width: 2
Range: -
Format:

Questions and instructions

Categories
Value Category
1 Bricks or block of cement
2 Stone or ashlars with cement or lime
3 Adobe bricks
4 Compact soil with clay
5 Reed with clay
6 Stone with mud
7 Wood
8 Woven straw mat
9 Other material
10 Triplay
11 Wall calamine
12 Plastic
13 Cane
14 Pona/Palm
98 Don't know
99 NA/Refused
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.