IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BGD_2010_IFS_V01_M / variable [F2]
central

Informal Firms Survey 2010

Bangladesh, 2010
Get Microdata
Reference ID
BGD_2010_IFS_v01_M
Producer(s)
David McKenzie
Metadata
DDI/XML JSON
Created on
Jul 07, 2015
Last modified
Mar 29, 2019
Page views
10977
Downloads
1184
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • egi_census_data_(19
    dist)_NEW
  • informality_data_NEW
  • sampleweights

How long does it take to obtain goods for which you have run out of stock? (q7_11)

Data file: informality_data_NEW

Overview

Valid: 1630
Invalid: 94
Minimum: 1
Maximum: 5
Type: Discrete
Decimal: 0
Start: 666
End: 666
Width: 1
Range: -
Format:

Questions and instructions

Literal question
Section 7: Business Skills and Practices Score-Card
Buying and Stock Control
7.11. How long does it take to obtain goods for which you have run out of stock?
Categories
Value Category
1 A day or less
2 More than a day, less than a week
3 A week
4 More than a week, less than a month
5 A month or more
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.