IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / VNM_2015_ES_V01_M / variable [F2]
central

Enterprise Survey 2015

Vietnam, 2014 - 2016
Get Microdata
Reference ID
VNM_2015_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jan 18, 2017
Last modified
Mar 29, 2019
Page views
18124
Downloads
1069
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • vietnam_2015_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: vietnam_2015_full_data

Overview

Valid: 153
Invalid: 843
Type: Discrete
Decimal: 0
Start: 1096
End: 1098
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
-7 Does not apply
-6
-5
2
3
4
7
8
10
14
15
20
21
30
40
45
50
60
90
100
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.