IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / CMR_2016_ES_V01_M / variable [F4]
central

Enterprise Survey 2016

Cameroon, 2016
Get Microdata
Reference ID
CMR_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
11130
Downloads
414
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • cameroon_2016_full_data

Total Annual Expenditure For Purchases Of Land And Buildings In Last Fiscal Yr (n5b)

Data file: cameroon_2016_full_data

Overview

Valid: 167
Invalid: 194
Type: Discrete
Decimal: 0
Start: 1229
End: 1237
Width: 9
Range: -
Format:

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], how much did this establishment spend on purchases of: Land and buildings
Categories
Value Category
-9 Don't know (spontaneous)
0
5
8
40000
50000
100000
150000
200000
250000
283129
300000
350000
400000
500000
600000
700000
800000
1000000
1500000
1900000
2000000
2300000
2500000
3000000
3500000
5000000
6000000
6500000
7000000
8000000
10000000
12000000
15000000
20000000
25000000
30000000
40000000
50000000
72000000
80000000
100000000
340000000
404000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
The category machinery, vehicles and equipment is the annual investment of anything used directly by this establishment to produce. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment

Land, buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services.

Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.