IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GIN_2016_ES_V01_M / variable [F5]
central

Enterprise Survey 2016

Guinea, 2016
Get Microdata
Reference ID
GIN_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
7836
Downloads
340
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • guinea_2016_full_data

Total Annual Expenditure For Purchases Of Equipment In Last Fiscal Yr (n5a)

Data file: guinea_2016_full_data

Overview

Valid: 61
Invalid: 89
Type: Discrete
Decimal: 0
Start: 841
End: 850
Width: 10
Range: -
Format:

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], how much did this establishment spend on purchases of:
Machinery, vehicles, and equipment (new or used)
Categories
Value Category
-9 Don't know (spontaneous)
0
2
500000
1100000
9000000
12000000
20000000
22000000
23000000
25000000
27000000
30000000
36000000
40000000
45000000
46000000
50000000
60000000
65000000
75000000
80000000
88000000
90000000
100000000
110000000
112000000
120000000
140000000
200000000
207000000
620000000
655000000
700000000
2376000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
The category machinery, vehicles and equipment is the annual investment of anything used directly by this establishment to produce. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment

Land, buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services.

Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.