IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2009_MS_V01_M_WB / variable [F1]
central

Micro-Enterprise Survey 2009

Nepal, 2009
Get Microdata
Reference ID
NPL_2009_MS_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
9934
Downloads
422
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2009-Micro-full
    data-

how many days did it take for you to obtain a water connection? (c13)

Data file: Nepal-2009-Micro-full data-

Overview

Valid: 0
Invalid: 118
Type: Discrete
Decimal: 0
Start: 148
End: 149
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 dont know
-6 still in process
-5 application denied
1 less than one day
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.