IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2009_MS_V01_M_WB / variable [F1]
central

Micro-Enterprise Survey 2009

Nepal, 2009
Get Microdata
Reference ID
NPL_2009_MS_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
10008
Downloads
422
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2009-Micro-full
    data-

did you experience insufficient water supply for production in last fiscal yr? (c15)

Data file: Nepal-2009-Micro-full data-

Overview

Valid: 50
Invalid: 68
Type: Discrete
Decimal: 0
Start: 152
End: 153
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year 2007 2008, did this establishment experience insufficient water supply for production?
Categories
Value Category
-9 don't know
1 yes
2 no
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.