IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HND_2016_ES_V01_M / variable [F4]
central

Enterprise Survey 2016

Honduras, 2016 - 2017
Get Microdata
Reference ID
HND_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
8507
Downloads
250
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • honduras_2016_full_data

Over Last Fy, Did This Establishment Experience Power Outages? (c6)

Data file: honduras_2016_full_data

Overview

Valid: 332
Invalid: 0
Type: Discrete
Decimal: 0
Start: 122
End: 123
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year 2015, did this establishment experience power outages?
Categories
Value Category
-9 Don't know (spontaneous)
1 Yes
2 No
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Power outages occur when there is equipment malfunction from the failure of adequate supply of power. Brownouts that cause some, but not all, equipment to malfunction are also considered power outages.

Note that if power outages are planned, i.e. “load shedding”, this is considered a power outage if the scheduled outage interrupts the operations of the establishment.

However if power outages are planned and the scheduled outage does NOT interrupt the operations of the establishment, this is not considered a power outage. Situations where the electricity/lights flicker and the experiences of both workers and/or customers are not affected are not considered power outages
Question post text
2 -> GO TO QUESTION C.10
-9 -> GO TO QUESTION C.10
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.