IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HND_2016_ES_V01_M / variable [F4]
central

Enterprise Survey 2016

Honduras, 2016 - 2017
Get Microdata
Reference ID
HND_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
8734
Downloads
250
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • honduras_2016_full_data

Total Annual Expenditure For Purchases Of Equipment In Last Fiscal Yr (n5a)

Data file: honduras_2016_full_data

Overview

Valid: 142
Invalid: 190
Type: Discrete
Decimal: 0
Start: 1641
End: 1649
Width: 9
Range: -
Format:

Questions and instructions

Literal question
In fiscal year 2015, how much did this establishment spend on purchases of new or used machinery, vehicles, and equipment?
Categories
Value Category
-9 Don't know (spontaneous)
0
2000
8000
10000
13500
15000
17900
20000
24000
25000
30000
40500
41000
45000
50000
60000
70200
74076
80000
100000
105480
117075
117895
125000
130000
150000
180000
200000
234000
250000
260000
300000
323000
345000
350000
400000
430000
500000
600000
702000
774180
800000
819000
950000
1000000
1054800
1170000
1200000
1500000
1674000
2000000
2122222
2330000
2343000
2500000
3000000
5000000
5500000
6000000
8000000
9000000
10000000
11000000
14000000
15000000
15750000
20000000
24000000
25000000
27000000
30000000
35130000
50000000
81000000
389000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
- INTERVIEWER: READ OUT
Purchase of (new or used) machinery, equipment, and vehicles: includes anything used directly by this establishment to produce goods or provide services. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment
Land and buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services. Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Question post text
IF 0, GO TO QUESTION N.5B
-9 -> GO TO QUESTION N.5B
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.