IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ECU_2003-2017_ES-P_V01_M / variable [F4]
central

Enterprise Survey 2003-2006-2010-2017

Ecuador, 2003 - 2017
Get Microdata
Reference ID
ECU_2003-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
16077
Downloads
79
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ecuador_2003_2006_2010_2017

Total Annual Cost Of Finished Goods/Materials Bought To Resell In Last Fiscal Yr (_2010_2017_n2i)

Data file: Ecuador_2003_2006_2010_2017

Overview

Valid: 217
Invalid: 1621
Type: Discrete
Decimal: 0
Start: 1053
End: 1062
Width: 10
Range: -
Format:

Questions and instructions

Question pretext
SHOW CARD
READ OUT
Literal question
For fiscal year [insert last complete fiscal year], please provide the following information about this establishment:
- Total annual cost of finished goods and materials purchased to resell
Categories
Value Category
-9 Don't know (spontaneous)
0
200
300
350
355
420
542
600
693
700
760
800
845
900
1000
1105
1200
1400
1500
1870
2000
2160
2200
2400
2472
2500
3000
3255
3400
3600
4000
4400
5000
6000
6500
6600
7000
7112
7161
7200
7500
8000
8322
9600
10200
12000
12200
13270
13500
14300
15000
18000
20000
22000
25000
25876
30000
36000
40000
40249
40250
42000
42243
45027
48000
56000
68000
70000
80000
84442
85000
85235
89535
95000
100000
102000
111095
113251
120000
125000
140000
150000
155000
157000
159517
165000
170310
173954
180000
240451
300000
330000
332000
340000
365000
380000
380469
382386
393578
420000
428126
428200
448952
450000
460000
500000
520000
579900
600000
644660
665000
700000
802524
820000
850000
868225
884579
900000
906736
954000
970000
1000000
1092927
1100000
1200000
1203000
1230254
1460000
1600000
1822083
1950000
2000000
2049857
2200000
2300000
2333687
2349330
2500000
2695046
3000000
3863000
4000000
4430383
6000000
6400000
6833135
8000000
8188523
8300000
9750000
20000000
24000000
28305738
375000000
1374030000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance). Raw materials and intermediate goods: (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements. Finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold. This is usually an item directly taken from the financial statements. Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment. Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, forklifts, or other motor vehicles associated with the establishment. Other costs of production not included above: (M) this should be computed as total costs of production minus the items included above.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.