IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2017_ES_V01_M / variable [F1]
central

Enterprise Survey 2017

Sierra Leone, 2017
Get Microdata
Reference ID
SLE_2017_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
6322
Downloads
231
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • sierra_leone_2017_full_data

Net Book Value of Machinery Vehicles, And Equipment In Last Fiscal Year (n6a)

Data file: sierra_leone_2017_full_data

Overview

Valid: 77
Invalid: 75
Type: Discrete
Decimal: 0
Start: 1873
End: 1881
Width: 9
Range: -
Format:

Questions and instructions

Literal question
From this establishment’s Balance Sheet for fiscal year [insert last complete fiscal year], what was the net book value, that is the value of assets after depreciation, of the following - machinery, vehicles, and equipment?
Categories
Value Category
-9 Don't know (spontaneous)
0
200
200000
300000
400000
500000
560000
600000
750000
830000
1000000
1200000
1500000
2000000
2500000
3000000
4000000
5000000
6000000
8000000
9000000
10000000
11000000
15000000
20000000
25000000
30000000
45000000
74000000
140000000
150000000
158000000
250000000
450000000
800000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Net book value equals the purchase value minus depreciation.

The net book value represents the actual cost of assets at the time they were acquired, including all costs incurred in making the assets usable (such as transportation and installation) minus depreciation accumulated since the date of purchase. Included in the assets are all buildings, structures, machinery, and equipment (production, office, and transportation equipment) for which depreciation reserves are maintained. Accordingly, the value of assets at the end of the year includes the value of construction in progress.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.