IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UGA_2018_WBCS_V01_M / variable [F1]
central

World Bank Group Country Survey 2018

Uganda, 2018
Get Microdata
Reference ID
UGA_2018_WBCS_v01_M
Producer(s)
Public Opinion Research Group
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
7289
Downloads
193
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uganda_cos_fy18_data_file_final_

Are timely (d2)

Data file: uganda_cos_fy18_data_file_final_

Overview

Valid: 402
Invalid: 255
Minimum: 1
Maximum: 10
Type: Discrete
Decimal: 0
Start: 661
End: 663
Width: 3
Range: 1 - 10
Format: Numeric

Questions and instructions

Literal question
Section D: World Bank Group's knowledge work and activities (i.e., analysis, studies, research, data, reports, conference)

In Lao PDR, to what extent do you believe that the World Bank Group’s knowledge work and activities:

D2 Are timely
Categories
Value Category Cases
1 To no degree at all 5
1.2%
2 10
2.5%
3 15
3.7%
4 36
9%
5 76
18.9%
6 75
18.7%
7 77
19.2%
8 45
11.2%
9 28
7%
10 To a very significant degree 35
8.7%
-99 39
11 Don't know 85
Sysmiss 131
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.