IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / URY_2017_ES_V01_M / variable [F1]
central

Enterprise Survey 2017

Uruguay, 2017
Get Microdata
Reference ID
URY_2017_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
5962
Downloads
134
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • uruguay_2017_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: uruguay_2017_full_data.dta

Overview

Valid: 108
Invalid: 239
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.