IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2013_AMS_V01-ID_M / variable [F1]
central

Annual Manufacturing Survey 2013

Indonesia, 2012 - 2014
Get Microdata
Reference ID
IDN_2013_AMS_v01-ID_M
Producer(s)
Sub Direktorat Statistik Industri Besar dan Sedang
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
4218
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • 2013mfg13e

Persentase realisasi produksi selama th 2013 terhadap kapasitas terpasang (PRPRCA13)

Data file: 2013mfg13e

Overview

Valid: 0
Invalid: 0
Type: Continuous
Decimal: 0
Start: 454
End: 456
Width: 3
Range: 0 - 100
Format: Numeric

Questions and instructions

Literal question
Persentase realisasi produksi selama th 2013 terhadap kapasitas terpasang
Interviewer instructions
Tuliskan persentase realisasi produksi terhadap kapasitas terpasang. Apabila perusahaan memproduksi tanpa mesin maka apabila perusahaan sudah menetapkan target awal,realisasi kapasitas produksi bisa lebih dari 100%. Tetapi jika perusahaan tidak
menetapkan target produksinya maka realisasi kapasitas produksi tidak boleh lebih dari 100%.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.