Home
Microdata Catalog
Citations
Login
Login
Home
/
Central Data Catalog
/
IDN_2018_TEIBVF_V01_M
Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018
Indonesia
,
2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML
JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
9269
Downloads
204
Study Description
Data Dictionary
Downloads
Get Microdata
Data files
BPS_FT_(0-7)_A_public
BPS_FT_(0-7)_B_public
BPS_FT_(0-7)_C_public
BPS_FT_(0-7)_D_public
BPS_FT_(0-7)_E_public
Data file: BPS_FT_(0-7)_E_public
VILLAGE LAW 2018 TECHNICAL EVALUATION
Infrastructure Type E – IRRIGATION
Cases:
12
Variables:
112
Variables
kodedesa
BPS unique village code
infra_type
Type of infrastructure
infra_VID
Village level identifying infrastructure number
infra_ID
Unique infrastructure number
yr_constr
Year of infrastructure construction
type_constr
Type of infrastructure construction
constr_modality
Modality of infrastructure construction
num_hh
Number of households benefitting from infrastructure construction
num_benef
Number of beneficiaries benefitting from infrastructure construction
remote
Remote/not remote status of infrastructure construction location, by village
date_inspect
Date of infrastructure construction inspection
Layout
System layout, evaluation result
DesignR
Resevoir design, evaluation result
Weir
Weir, evaluation result
Controls
Water level controls, evaluation result
Ditches
Ditches, evaluation result
Culvert
Culvert and pipes, evaluation result
EmbankA
Embankments (fill slope), evaluation result
EmbankB
Embankments (cut slope), evaluation result
Dimensions
Channel (dimensions), evaluation result
Outlets
Channel (field outlets), evaluation result
Structures
Channel control structures, evaluation result
StructureWall
Retaining Wall (structural integrity), evaluation result
Eros
Retaining Wall (erosion protection), evaluation result
OpMain
Operation and maintenance, evaluation result
Constr
Construction quality, assessment
DesignCom
Design completeness, assessment
Funct
Functionality, assessment
Dconsult
Adequacy of design consultation with users
File
File completeness (meeting notes, land donation records, design drawings, etc.
EngNotes
Kabupaten engineer and TF inspection notes to file
InspForm
Final sub-project inspection report, in file and fully completed
Drawing
As-built drawing
QualFac
Quality of technical facilitation
FreqVisit
Frequency of TF site visits (number of visits)
ConstrPer
Construction period (in months)
Env
Environmental Practices (site inspection confirms appropriate...), assessment
Land
Land Acquisition (site inspection confirms appropriate...), assessment
Social
Social Safegaurds (site inspection confirms appropriate...), assessment
Length
Canal (length), in m
Width
Canal (width), in m
Depth
Canal (depth), in m
Earth
Canal Material (contains earth)
Masonry
Canal Material (contains masonry)
Concrete
Canal Material (contains concrete)
Budget
Canal Cost (budget), in IDR
Actual
Canal Cost (actual), in IDR / meter
Standard
Canal Cost (standard unit, from Kabupaten records), in IDR / meter
PerfRepairs
Major repairs or rehabilitation performed
ReqRepairs
Major repairs or rehabilitation required
EnvDam
Cause of Damage, environmental
DesDam
Cause of Damage, poor design
ConstrDam
Cause of Damage, poor construction
MatDam
Cause of Damage, materials
OMDam
Cause of Damage, poor operations & maintanence
CostRepair
Repair Costs (actual)
CostEst
Repair Costs (estimated)
Repair
Repair performed by
Date
Repair date
Maintain_1
Routine Maintenance (vegetation removal, aquatic and terrestrial)
Maintain_2
Routine Maintenance (sediment removal)
Maintain_3
Routine Maintenance (mechanical gates, outlets)
Maintain_4
Routine Maintenance (canal repair)
Maintain_5
Routine Maintenance (embankment erosion protection)
Maintain_6
Routine Maintenance (fencing repair)
Plan
Operation and Maintanence Plan (has a multi-year plan)
Link
Operation and Maintanence Plan (linked to line ministries)
Division
Operation and Maintanence Plan (has clear division of responsibilities and costs
CostsRoutine
Operation and Maintanence Plan (contains estimated costs, routine)
CostsCapital
Operation and Maintanence Plan (contains estimated costs, capital repairs)
Place
Operation and Maintanence Committee (in place and functioning)
Fee
Operation and Maintanence Committee (user fee in place)
Services
Operation and Maintanence Committee (user fee for specified services)
Contributions
Operation and Maintanence Committee (contributions from other sources)
Current
Operation and Maintanence Committee (current funds within operation and maintane
Afford
Operation and Maintanence Committee (affordibility of user fees)
Inputs
Operation and Maintanence Committee (government inputs to schools and medical cl
CommInput
Operation and Maintanence Committee (labor and material input from community)
GovInput
Operation and Maintanence Committee (labor and material input from government)
Training
Operation and Maintanence Training (O&M training received)
Ongoing
Operation and Maintanence Training (ongoing capacity development)
BudgetTrain
Operation and Maintanence Training (annual training budget)
Flood
Climate Resiliency (safe from flooding)
Landslide
Climate Resiliency (low landslide risk; no steep slopes)
Fire
Climate Resiliency (low forest fire risk; clear area between building and forest
IssueDesign_1
Issue Design (lack of construction details on drawings)
IssueDesign_2
Issue Design (inaccurate drawings of connection details)
IssueDesign_3
Issue Design (improper steel reinforcement design)
IssueDesign_4
Issue Design (constructed dimensions differ from plan)
IssueLayout_1
Issue Layout (poor site selection for infrastructure)
IssueLayout_2
Issue Layout (erosion protection around facilities)
IssueLayout_3
Issue Layout (improper weir design)
IssueLayout_4
Issue Layout (undermining from poor elevation of apron)
IssueSteel_1
Issue Steel Reinforcement (short development length in steel reinforcing)
IssueSteel_2
Issue Steel Reinforcement (improperly bent reinforcing cage stirrups)
IssueSteel_3
Issue Steel Reinforcement (lack of tie bar wiring)
IssueConcrete_1
Issue Concrete (absence of concrete mix design)
IssueConcrete_2
Issue Concrete (honeycombing in concrete)
IssueConcrete_3
Issue Concrete (exposed/shallow reinforcing steel)
IssueConcrete_4
Issue Concrete (improper materials or poorly mixed concrete)
IssueResevoir_1
Issue Resevoir Emankment (steep slopes)
IssueResevoir_2
Issue Resevoir Emankment (no erosion protection)
IssueResevoir_3
Issue Resevoir Emankment (undermining)
IssueChannel_1
Issue Irrigation Controls (highly vegetated)
IssueChannel_2
Issue Irrigation Controls (no controls for field outlets)
IssueChannel_3
Issue Irrigation Controls (broken concrete)
IssueControls_1
Issue Channel Controls (mechanical fixtures broken or leaking)
IssueControls_2
Issue Channel Controls (broken concrete)
Priority
Did the process of infrastructure prioritization within the village follow Villa
Procure
Did the procurement process (either swakelola or contractor) follow all laws and
Participate
How many persons have been participating in these meetings and how effective are
Women
Women's participation in prioritization, procurement and community meetings
Total: 112
Back to Catalog