Home
Microdata Catalog
Citations
Login
Login
Home
/
Central Data Catalog
/
IDN_2018_TEIBVF_V01_M
Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018
Indonesia
,
2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML
JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
9267
Downloads
204
Study Description
Data Dictionary
Downloads
Get Microdata
Data files
BPS_FT_(0-7)_A_public
BPS_FT_(0-7)_B_public
BPS_FT_(0-7)_C_public
BPS_FT_(0-7)_D_public
BPS_FT_(0-7)_E_public
Data file: BPS_FT_(0-7)_A_public
VILLAGE LAW 2018 TECHNICAL EVALUATION
Infrastructure Type A – BUILDING
Cases:
33
Variables:
140
Variables
kodedesa
BPS unique village code
infra_type
Type of infrastructure
infra_VID
Village level identifying infrastructure number
infra_ID
Unique infrastructure number
yr_constr
Year of infrastructure construction
type_constr
Type of infrastructure construction
constr_modality
Modality of infrastructure construction
num_hh
Number of households benefitting from infrastructure construction
num_benef
Number of beneficiaries benefitting from infrastructure construction
remote
Remote/not remote status of infrastructure construction location, by village
date_inspect
Date of infrastructure construction inspection
Found
Foundation, evaluation result
Beam
Ground beam/plinth beam, evaluation result
Wall
Wall, evaluation result
Column
Column, evaluation result
RingBm
Ring beam, evaluation result
TrussAssemb
Truss construction assembly and components, evaluation result
TrussConnect
Truss connection to ring beam, evaluation result
RoofMat
Roof materials, evaluation result
RoofConn
Roof connections to purlin, evaluation result
Floor
Floor, evaluation result
Plaster
Plastering, evaluation result
Ceiling
Ceiling, evaluation result
Paint
Painting, evaluation result
Doors
Doors and windows, evaluation result
Toilet
Toilet, evaluation result
Tank
Septic tank, evaluation result
Ramp
Ramp and handrail, evaluation result
UtilWater
Water utilities, evaluation result
UtilElec
Electrical installation, evaluation result
UtilDrain
Drainage, evaluation result
Other
Other structures, evaluation result
OpMain
Operation and maintenance, evaluation result
Constr
Construction quality, assessment
DesignCom
Design completeness, assessment
Funct
Functionality, assessment
Design
Adequacy of design consultation with users
File
File completeness (meeting notes, land donation records, design drawings, etc.
EngNotes
Kabupaten engineer and TF inspection notes to file
InspForm
Final sub-project inspection report, in file and fully completed
Drawing
As-built drawing
QualFac
Quality of technical facilitation
FreqVisit
Frequency of TF site visits (number of visits)
ConstrPer
Construction period (in months)
Env
Environmental Practices (site inspection confirms appropriate...), assessment
Land
Land Acquisition (site inspection confirms appropriate...), assessment
Social
Social Safegaurds (site inspection confirms appropriate...), assessment
Width
Building Dimensions (width), in m
Length
Building Dimensions (length), in m
Area
Building Dimensions (area), in square meters
Rooms
Number of rooms
ReinforcedStructure
Building Structure (contains reinforced concrete)
WoodStructure
Building Structure (contains wood)
SteelStructure
Building Structure (contains steel)
WoodTruss
Trusswork (contains wood)
SteelTruss
Trusswork (contains steel)
Budget
Building Cost (budget), in IDR
Actual
Building Cost (actual), in IDR / square meter
StandardCost
Building Cost (standard unit, from Kabupaten records), in IDR / square meter
PerfRepairs
Major repairs or rehabilitation performed
ReqRepairs
Major repairs or rehabilitation required
EnvDam
Cause of Damage, environmental
DesDam
Cause of Damage, poor design
ConstrDam
Cause of Damage, poor construction
MatDam
Cause of Damage, materials
OMDam
Cause of Damage, poor operations & maintanence
CostRepair
Repair Costs (actual)
CostEst
Repair Costs (estimated)
Repair
Repair performed by
Date
Repair date
Maintain_1
Routine Maintenance (roof repair)
Maintain_2
Routine Maintenance (mechanical
Maintain_3
Routine Maintenance (plumbing repair)
Maintain_4
Routine Maintenance (concrete repair)
Maintain_5
Routine Maintenance (plaster repair)
Maintain_6
Routine Maintenance (washing)
Maintain_7
Routine Maintenance (painting)
Maintain_8
Routine Maintenance (drainage)
Plan
Operation and Maintanence Plan (has a multi-year plan)
Link
Operation and Maintanence Plan (linked to line ministries)
Division
Operation and Maintanence Plan (has clear division of responsibilities and costs
CostsRoutine
Operation and Maintanence Plan (contains estimated costs, routine)
CostsCapital
Operation and Maintanence Plan (contains estimated costs, capital repairs)
Place
Operation and Maintanence Committee (in place and functioning)
Fee
Operation and Maintanence Committee (user fee in place)
Services
Operation and Maintanence Committee (user fee for specified services)
Contributions
Operation and Maintanence Committee (contributions from other sources)
Current
Operation and Maintanence Committee (current funds within operation and maintane
Afford
Operation and Maintanence Committee (affordibility of user fees)
Inputs
Operation and Maintanence Committee (government inputs to schools and medical cl
CommInput
Operation and Maintanence Committee (labor and material input from community)
GovInput
Operation and Maintanence Committee (labor and material input from government)
Training
Operation and Maintanence Training (O&M training received)
Ongoing
Operation and Maintanence Training (ongoing capacity development)
BudgetTrain
Operation and Maintanence Training (annual training budget)
Flood
Climate Resiliency (safe from flooding)
Eros
Climate Resiliency (erosion protection measures are sufficient)
Landslide
Climate Resiliency (low landslide risk; no steep slopes)
Fire
Climate Resiliency (low forest fire risk; clear area between building and forest
IssueDesign_1
Issue Design (lack of construction details on drawings)
IssueDesign_2
Issue Design (inaccurate drawings of connection details)
IssueDesign_3
Issue Design (improper wood column design)
IssueDesign_4
Issue Design (constructed dimensions differ from plan)
IssueRoof_1
Issue Roof / Truss (inadequate overlap of roof sheeting)
IssueRoof_2
Issue Roof / Truss (improper connection of roof to truss (no cleat, etc.))
IssueRoof_3
Issue Roof / Truss (unreinforced splices in truss members)
IssueRoof_4
Issue Roof / Truss (missing steel strapping)
IssueRoof_5
Issue Roof / Truss (use of nails rather than bolts)
IssueRoof_6
Issue Roof / Truss (undersized/missing truss members)
IssueRoof_7
Issue Roof / Truss (improper connection of truss to ring beam)
IssueSteel_1
Issue Steel (short development length in steel reinforcing)
IssueSteel_2
Issue Steel (improperly bent reinforcing cage stirrups)
IssueSteel_3
Issue Steel (lack of tie bar wiring)
IssueSteel_4
Issue Steel (missing anchors, foundation to ground beam)
IssueSteel_5
Issue Steel (missing anchors, column to wall)
IssueConcrete_1
Issue Concrete / Plaster (absence of concrete mix design)
IssueConcrete_2
Issue Concrete / Plaster (honeycombing in concrete)
IssueConcrete_3
Issue Concrete / Plaster (exposed/shallow reinforcing steel)
IssueConcrete_4
Issue Concrete / Plaster (improper materials or poorly mixed concrete)
IssueConcrete_5
Issue Concrete / Plaster (undersized concrete column/beam)
IssueConcrete_6
Issue Concrete / Plaster (improper plastering technique)
IssueConcrete_7
Issue Concrete / Plaster (poor plastering and finishing)
IssueSanitary_1
Issue Sanitary Facilities (toilet building not provided)
IssueSanitary_2
Issue Sanitary Facilities (no water connection to public system)
IssueSanitary_3
Issue Sanitary Facilities (poor drainage/ponding on floor)
IssueSanitary_4
Issue Sanitary Facilities (exposed PVC pipe)
IssueSanitary_5
Issue Sanitary Facilities (no access lid to septic tank)
IssueSanitary_6
Issue Sanitary Facilities (high watertable in septic tank)
IssueElectric_1
Issue Electric (no junction box at wiring connections)
IssueElectric_2
Issue Electric (low/unattached wiring in public area)
IssueElectric_3
Issue Electric (broken switch)
IssueElectric_4
Issue Electric (wiring installed but not energized)
IssueMisc_1
Issue Miscelaneous (broken mechanical fixtures)
IssueMisc_2
Issue Miscelaneous (no handicap ramp/too steep)
IssueMisc_3
Issue Miscelaneous (ponding on the floor)
IssueMisc_4
Issue Miscelaneous (poor drainage around building)
Priority
Did the process of infrastructure prioritization within the village follow Villa
Procure
Did the procurement process (either swakelola or contractor) follow all laws and
Participate
How many persons have been participating in these meetings and how effective are
Women
Women's participation in prioritization, procurement and community meetings
Total: 140