Home
Microdata Catalog
Citations
Login
Login
Home
/
Central Data Catalog
/
IDN_2018_TEIBVF_V01_M
Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018
Indonesia
,
2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML
JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
9266
Downloads
204
Study Description
Data Dictionary
Downloads
Get Microdata
Data files
BPS_FT_(0-7)_A_public
BPS_FT_(0-7)_B_public
BPS_FT_(0-7)_C_public
BPS_FT_(0-7)_D_public
BPS_FT_(0-7)_E_public
Data file: BPS_FT_(0-7)_B_public
VILLAGE LAW 2018 TECHNICAL EVALUATION
Infrastructure Type B – BRIDGE
Cases:
15
Variables:
131
Variables
kodedesa
BPS unique village code
infra_type
Type of infrastructure
infra_VID
Village level identifying infrastructure number
infra_ID
Unique infrastructure number
yr_constr
Year of infrastructure construction
type_constr
Type of infrastructure construction
constr_modality
Modality of infrastructure construction
num_hh
Number of households benefitting from infrastructure construction
num_benef
Number of beneficiaries benefitting from infrastructure construction
remote
Remote/not remote status of infrastructure construction location, by village
date_inspect
Date of infrastructure construction inspection
Layout
Layout, evaluation result
Found
Foundation, evaluation result
ErosFT1
Erosion protection, evaluation result
Abut
Abutments, evaluation result
Pier
Piers/supports, evaluation result
Wing
Wingalls, evaluation result
Concrete
Concrete, evaluation result
DeckBm
Deck beams, evaluation result
Deck
Deck, evaluation result
Sub
Submerged concrete laneway, evaluation result
Hand
Handrail, evaluation result
Connect
Connections (nails, bolts), evaluation result
Apron
Apron / ramp / access to road, evaluation result
Other
Other structures, evaluation result
OpMain
Operation and maintenance, evaluation result
Constr
Construction quality, assessment
DesignCom
Design completeness, assessment
Funct
Functionality, assessment
Design
Adequacy of design consultation with users
File
File completeness (meeting notes, land donation records, design drawings, etc.
EngNotes
Kabupaten engineer and TF inspection notes to file
InspForm
Final sub-project inspection report, in file and fully completed
Drawing
As-built drawing
QualFac
Quality of technical facilitation
FreqVisit
Frequency of TF site visits (number of visits)
ConstrPer
Construction period (in months)
Env
Environmental Practices (site inspection confirms appropriate...), assessment
Land
Land Acquisition (site inspection confirms appropriate...), assessment
Social
Social Safegaurds (site inspection confirms appropriate...), assessment
Length
Bridge Dimensions (length), in m
Width
Bridge Dimensions (width), in m
Area
Bridge Dimensions (area), in square meters
ReinforcedDeck
Bridge Deck (contains reinforced concrete)
WoodDeck
Bridge Deck (contains wood)
SteelDeck
Bridge Deck (contains steel)
ReinforcedBeams
Beams (contains reinforced concrete)
WoodBeams
Beams (contains wood)
SteelBeams
Beams (contains steel)
ReinforcedColumns
Columns (contain reinforced concrete)
WoodColumns
Columns (contain wood)
MasonryColumns
Columns (contain masonry)
SteelColumns
Columns (contain steel)
ReinforcedAbut
Abutments (contain reinforced concrete)
WoodAbut
Abutments (contain wood)
MasonryAbut
Abutments (contain masonry)
ReinforcedRail
Rainings (contain reinforced concrete)
WoodRail
Rainings (contain wood)
SteelRail
Rainings (contain steel)
Budget
Bridge Cost (budget), in IDR
Actual
Bridge Cost (actual), in IDR / square meter
StandardCost
Bridge Cost (standard unit, from Kabupaten records), in IDR / square meter
PerfRepairs
Major repairs or rehabilitation performed
ReqRepairs
Major repairs or rehabilitation required
EnvDam
Cause of Damage, environmental
DesDam
Cause of Damage, poor design
ConstrDam
Cause of Damage, poor construction
MatDam
Cause of Damage, materials
OMDam
Cause of Damage, poor operations & maintanence
CostRepair
Repair Costs (actual)
CostEst
Repair Costs (estimated)
Repair
Repair performed by
Date
Repair date
Maintain_1
Routine Maintenance (deck repair)
Maintain_2
Routine Maintenance (concrete repair)
Maintain_3
Routine Maintenance (drainage)
Maintain_4
Routine Maintenance (apron and road repair)
Maintain_5
Routine Maintenance (support structure)
Maintain_6
Routine Maintenance (railings)
Maintain_7
Routine Maintenance (erosion protection)
Maintain_8
Routine Maintenance (other)
Plan
Operation and Maintanence Plan (has a multi-year plan)
Link
Operation and Maintanence Plan (linked to line ministries)
Division
Operation and Maintanence Plan (has clear division of responsibilities and costs
CostsRoutine
Operation and Maintanence Plan (contains estimated costs, routine)
CostsCapital
Operation and Maintanence Plan (contains estimated costs, capital repairs)
Place
Operation and Maintanence Committee (in place and functioning)
Fee
Operation and Maintanence Committee (user fee in place)
Services
Operation and Maintanence Committee (user fee for specified services)
Contributions
Operation and Maintanence Committee (contributions from other sources)
Current
Operation and Maintanence Committee (current funds within operation and maintane
Afford
Operation and Maintanence Committee (affordibility of user fees)
Inputs
Operation and Maintanence Committee (government inputs to schools and medical cl
CommInput
Operation and Maintanence Committee (labor and material input from community)
GovInput
Operation and Maintanence Committee (labor and material input from government)
Training
Operation and Maintanence Training (O&M training received)
Ongoing
Operation and Maintanence Training (ongoing capacity development)
BudgetTrain
Operation and Maintanence Training (annual training budget)
Flood
Climate Resiliency (safe from flooding)
ErosFT4
Climate Resiliency (erosion protection measures are sufficient)
Landslide
Climate Resiliency (low landslide risk; no steep slopes)
Fire
Climate Resiliency (low forest fire risk; clear area between building and forest
IssueDesign_1
Issue Design (lack of construction details on drawings)
IssueDesign_2
Issue Design (inaccurate drawings of connection details)
IssueDesign_3
Issue Design (improper steel reinforcement design)
IssueDesign_4
Issue Design (constructed dimensions differ from plan)
IssueLayout_1
Issue Layout (poor site selection)
IssueLayout_2
Issue Layout (inadequate erosion protection)
IssueLayout_3
Issue Layout (inadequate depth of foundation)
IssueLayout_4
Issue Layout (pier location subject to erosive forces)
IssueLayout_5
Issue Layout (abutment and wingwall design)
IssueSteel_1
Issue Steel Reinforcement (short development length in steel reinforcing)
IssueSteel_2
Issue Steel Reinforcement (improperly bent reinforcing cage stirrup bars)
IssueSteel_3
Issue Steel Reinforcement (lack of tie bar wiring)
IssueSteel_4
Issue Steel Reinforcement (missing anchors, foundation to deck beam)
IssueSteel_5
Issue Steel Reinforcement (Missing anchors, column to deck)
IssueConcrete_1
Issue Concrete (absence of concrete mix design)
IssueConcrete_2
Issue Concrete (honeycombing in concrete)
IssueConcrete_3
Issue Concrete (exposed/shallow reinforcing steel)
IssueConcrete_4
Issue Concrete (improper materials or poorly mixed concrete)
IssueConcrete_5
Issue Concrete (undersized concrete column/beam)
IssueWood_1
Issue Wood (inadequate structural design)
IssueWood_2
Issue Wood (lack of bolted connections)
IssueWood_3
Issue Wood (inadequate deck and running boards)
IssueMisc_1
Issue Miscellaneous (inadequate railings and connections)
IssueMisc_2
Issue Miscellaneous (inadequate apron and ramp)
IssueMisc_3
Issue Miscellaneous (inadequate drainage)
Priority
Did the process of infrastructure prioritization within the village follow Villa
Procure
Did the procurement process (either swakelola or contractor) follow all laws and
Participate
How many persons have been participating in these meetings and how effective are
Women
Women's participation in prioritization, procurement and community meetings
Total: 131
Back to Catalog