IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2018_TEIBVF_V01_M / variable [F8]
central

Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018

Indonesia, 2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
14242
Downloads
308
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BPS_FT_(0-7)_A_public
  • BPS_FT_(0-7)_B_public
  • BPS_FT_(0-7)_C_public
  • BPS_FT_(0-7)_D_public
  • BPS_FT_(0-7)_E_public

Women's participation in prioritization, procurement and community meetings (Women)

Data file: BPS_FT_(0-7)_C_public

Overview

Valid: 14
Invalid: 0
Minimum: 2
Maximum: 5
Type: Discrete
Decimal: 0
Start: 261
End: 261
Width: 1
Range: 1 - 5
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Highly Effective (lots of participation, >50%) 0
0%
2 Effective (some participation, about 50%) 1
7.1%
3 Moderately Effective (limited participation, <25%) 4
28.6%
4 Ineffective (little participation, <10%) 8
57.1%
5 No Data 1
7.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.