IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2018_TEIBVF_V01_M / variable [F9]
central

Village Law: Technical Evaluation of Infrastructure Built with Village Funds 2018

Indonesia, 2018
Get Microdata
Reference ID
IDN_2018_TEIBVF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
14796
Downloads
308
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BPS_FT_(0-7)_A_public
  • BPS_FT_(0-7)_B_public
  • BPS_FT_(0-7)_C_public
  • BPS_FT_(0-7)_D_public
  • BPS_FT_(0-7)_E_public

Quality of technical facilitation (QualFac)

Data file: BPS_FT_(0-7)_D_public

Overview

Valid: 94
Invalid: 0
Minimum: 1
Maximum: 4
Type: Discrete
Decimal: 0
Start: 360
End: 360
Width: 1
Range: 1 - 4
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Good 1
1.1%
2 Average 0
0%
3 Poor 25
26.6%
4 No Data 68
72.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.