IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2013-2018_MCC-RSPS_V01_M
central

Registry Systems Process Study 2013-2018, Independent Impact Evaluation

Mongolia, 2013 - 2018
Get Microdata
Reference ID
MNG_2013-2018_MCC-RSPS_v01_M
Producer(s)
Innovations for Poverty Action, The Cloudburst Group
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5646
Downloads
230
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Identification
  • Version
  • Scope
  • Coverage
  • Producers and sponsors
  • Survey instrument
  • Data collection
  • Access policy
  • Data Access
  • Contacts
  • Metadata production
  • Identification

    Survey ID number

    MNG_2013-2018_MCC-RSPS_v01_M

    Title

    Registry Systems Process Study 2013-2018

    Subtitle

    Independent Impact Evaluation

    Country
    Name Country code
    Mongolia MNG
    Abstract

    IPA:

    Evaluation design: Impact Evaluation

    1. Pre-post comparison of time and cost involving in select land-based transactions
    2. Involve two main instruments of measurement: Back Office time tracking survey and the Banking survey
    3. Qualitative interviews were conducted with registry officers to inform the understanding of how these measures affected workflow

    Evaluation question:
    Did some of the institutional strengthening activities of PRP reduce time and cost of completing land-based transactions?

    The institutional strengthening activities that can be evaluated are the installation of web-based electronic registry system (ePRS), the revision to law that govern access to property records law, and the digitization of paper archives.

    Results:
    Back Office Time Tracking survey - Tracked 9 land based transactions at General Authority of State Registry (GASR) - Shortest process, registering a collateral agreement took 6 work days. Longest process, registering land or structure on land took 12 days. Transactions took 3-6 days longer than official time posted by GASR.

    Banking survey - Tracked time it takes to apply for a mortgage or land-based loan including time it takes to prepare document, to submit and wait for bank approval, and to visit GASR offices to register for the mortgage or loan. Mortgage - 25 days for loan process and 14 days to prepare paperwork for loan application, total cost 360 USD. For land based loan - took 13 days for the loan process and 7.5 days to prepare paperwork, total cost 130 USD.

    Informational interviews - Mixed responses. All officers agree that there has been changes to the registration flow. However, lack of consensus on whether the changes have shortened the weight time for citizens. While opening of district offices have shortened travel distance for some citizens, multiple locations meant that documents had to travel to the main office for official signatures. All officers agreed that workload increased yet workforce did not. There was consensus that more people are registering due to increased awareness and growing construction sector. Officers also noted that government mandated 8% mortgage has increased demand for mortgages. Officers agree that technical upgrades provided by PRP have improved efficiency and that outreach activity had educated the public regarding property rights.

    Cloudburst Group:

    Evaluation design: Performance Evaluation

    This is a follow-up endline evaluation that adapts an existing evaluation design developed by IPA. Five research questions drive this follow-up evaluation:

    1. Did the land registry system strengthening component of the PRP lead to increases in demand and volume of formal land transactions, including land registration and related transfers at GAIPSR and mortgages at the banks?

    2. What were the characteristics of those who conducted formal land transactions before and after the introduction of ePRS?

    3. Did the land registry system strengthening component of the PRP result in changes in land transaction costs/time for land transactions?

    4. Were there changes in gender ratio of land owners? Were there any differences in results for parcels held by women/men?

    5. Did the land registry system strengthening component of the PRP lead to improvement in quality of property registration services? What was the significance of the land registry system strengthening component of the PRP?

    This follow-up evaluation draws upon six main sources of primary and secondary data to answer the evaluation questions: ePRS land transaction data, pre-ePRS land transaction data, a banking customer survey, structured key informant interviews (KIIs) with GAIPSR registrars and bank loan officers, focus group discussions (FGDs) with key beneficiary groups, and open-ended KIIs with key project stakeholders. In addition, the evaluation will produce a final ERR calculation of this activity of the PRP based on the main expected benefit streams.

    The PRP took place from 2008 to 2013, so this follow-up endline evaluation is occurring approximately five years after the close of project activities.

    Kind of Data

    Sample survey data [ssd]

    Unit of Analysis

    Banking - Individuals applying for a mortgage or loan using property as collateral at banks

    Back office - Application to process property-related transaction at GASR

    Version

    Version Description

    Anonymized dataset for public distribution.

    Scope

    Topics
    Topic Vocabulary
    Land MCC Sector

    Coverage

    Geographic Coverage

    IPA:
    Institutional Strengthening component of Property Rights Project was national wide in scope. While the physical upgrades to General Authority on State Registry (GASR) occurred in select project areas and electronic property rights sytem was first installed in project areas, legislative changes will be nationwide and adoption of ePRS is expected to roll out to rest of the country.

    Cloudburst Group:
    Different PRP components had different levels of geographic coverage across Ulaanbaatar and the rest of Mongolia.
    The infrastructure support provided to ALAMGaC was intended to improve cadastral mapping capabilities nationally. Additionally, the recommended legislative changes will have nationwide impacts if/when legislation is passed.
    Physical improvements were made to the under-resourced Property Rights Registration Department's (which eventually merged into GAIPSR, at the time called GASR) Central Office space, and new offices were established in four districts of Ulaanbaatar (Baganuur, Bayanzurkh, Chingeltei, and Songinokhairkhan).The document digitization and electronic registry upgrades were implemented in the Capital City of Ulaanbaatar and in eight provinces around the country [City of Erdenet (Orkhon aimag); City of Darkhan (Darkhan-Uul aimag); City of Arvaikheer (Uvurkhangai aimag); City of Uliastai (Zavkhan aimag); City of Khovd (Khovd aimag); of Zuunmod (Tuv aimag); City of Undurkhaan (Khentii aimag); and City of Choibalsan (Dornod aimag)]. These locations were chosen to produce maximum benefits as these provincial centers comprise Mongolia's main populated areas. However, this work (digitization and ePRS adoption) is expected to rollout nationwide with additional donor support.

    Universe

    The Banking survey covered Loan Applicants at banks, men and women aged above 18.

    The Back office time tracking survey covered people who engaged in land-based transactions at General Authority of State Registry (GASR).

    The informational interview covered qualitative interviews with GASR workers - Registry Officers of three district GASR offices (Chingeltei, Bayanzurkh, and Songinokhairkhan).

    Producers and sponsors

    Primary investigators
    Name
    Innovations for Poverty Action
    The Cloudburst Group
    Funding Agency/Sponsor
    Name
    Millennium Challenge Corporation

    Survey instrument

    Questionnaires

    IPA:
    All questionnaires are available both in English and Mongolian, although administered in Mongolian.

    • Banking survey - There were 3 questionnaires for the Banking Survey:
    1. Potential
    2. Initial
    3. Follow-Up.

    The Potential survey was used to identify potential respondents during the early stages of the loan application process. If passed, then the enumerator would immediately administer the initial survey which collected information about the early stages of the respondents' loan process and time costs of GASR related activities. Those that completed these two surveys were provided 7,000 MNT as a promised incentive for participating in the study. After approx. two weeks, the enumerators would follow up with the respondent using the Follow-Up survey which was administered over the phone.

    • Back office time tracking survey - There was no questionnaire for this survey. The procedural times were tracked by attaching barcodes to documents associated with the key transactions and scanning the barcodes at specific stages to track the paperwork's progress through GASR offices.

    • Informational Interview - The questionnaire consisted of three main parts.

    1. Basic information and GASR Employment history
    2. General perceptions of changes to GASR procedures and registration activity
    3. Awareness and perceptions of specific PRP activities

    Cloudbusrt Group:
    The banking customer survey questionnaire will serve as the main source of information about changes over time in the average time and cost to obtain a loan and the types of loans obtained between the 1st and 2nd round banking customer surveys. The banking customer survey is designed to track eligible loan applications (land or property based transactions, such as mortgages or collateralized loans) from submission to approval, including the processing of document requests to GAIPSR, to provide a picture of how the improvements within GAIPSR (ePRS, document digitization) translate into time savings when accessing credit.

    The GAIPSR structured KII questionnaire will be administered to all GAIPSR registrars employed at each district and province office within the MCA project area (Ulaanbaatar, Erdenet, Darkhan, Arvaikheer, Uliastai, Khovd, Zuunmod, Undurkhaan and Choibalsan) to understand the effects of the PRP infrastructure and capacity building interventions, including ePRS, as comprehensively as possible. The approximate sample size is estimated based upon the fact that the GAIPSR offices visited during follow-up evaluation scoping had seven to nine registrars employed per location.

    Another loan officer structured KII questionnaire will be administered to loan officers in Ulaanbaatar, Erdenet, Darkhan to understand the effects of registry strengthening on the lending process and general trends in the lending environment.

    FGDs with subgroups of interest are proposed in each of the four districts covered by the decentralization activities in Ulaanbaatar: with women, with residents engaging in land transactions (both men and women), with ger area residents (both men and women), with loan officers (both men and women), and with real estate agents (both men and women).

    The open-ended KII with key PRP stakeholders will provide additional nuanced context information about PRP implementation and changes since the end of the project.

    Data collection

    Dates of Data Collection
    Start End Cycle
    2013-07-15 2013-08-12 Back Office Baseline
    2013-07-20 2013-07-26 Informational Interviews
    2013-09-16 2013-10-20 Banking Baseline
    2018-05-15 2018-12-31 Follow-up data collection
    Data Collectors
    Name
    MEC LLC
    Supervision

    Banking Survey - Data collection by MEC LLC - team comprised of Survey Field Manager, 2 Staged Banking survey team ( initial and follow up). The role of the enumerators include pilot testing of the survey instruments, and conducting the interview among potential and main respondents.

    Back Office Time Tracking Survey - Data collection by MEC LLC - team comprised of Project team leader, Expert on Registration of Transactions at GASR, Database Manager, and Field Survey teams. Tasks of the field team leader include familiarization with general and 8 transaction workflow diagrams, attach the barcodes to each application until it reaches the target number, attach the barcodes at required steps, scan the barcode information at required steps, print the information using barcode printer, transfer the data using WiFi and server. The heads were responsible for smooth implementation of the data collection at each GASR office by ensuring that all application and the required steps are controlled, all equipment are working properly and information transferred smoothly.

    Informational Interviews - Data was collected by two IPA staff and one Millennium Challenge Account PRP staff. These three interviewers interviewed a total of nine registry officers, three each. They were responsible for retrieving as much information possible in accordance with the questionniare.

    Access policy

    Location of Data Collection

    Millennium Challenge Corporation

    Archive where study is originally stored

    Millennium Challenge Corporation
    http://data.mcc.gov/evaluations/index.php/catalog/134
    Cost: None

    Data Access

    Citation requirements

    This analysis uses publicly accessible data funded by the Millennium Challenge Corporation for the independent evaluation of the Urban Property Rights Project by Innovations for Poverty Action.

    Primary investigators: Erica Field, Leigh Linden, Daniel Rubenson, Shing-yi Wang

    Contacts

    Contacts
    Name Affiliation Email
    Monitoring & Evaluation Division Millennium Challenge Corporation impact-eval@mcc.gov

    Metadata production

    DDI Document ID

    DDI_MNG_2013-2018_MCC-RSPS_v01_M

    Producers
    Name Role
    Innovations for Poverty Action Independent Evaluator
    The Cloudburst Group Independent Evaluator
    Date of Metadata Production

    2014-12-31

    Metadata version

    DDI Document version

    Version 1.0 (December 2014): This is the first version.
    Version 2.0 (April 2015). Edited version based on Version 01 (DDI-MCC-MNG-IPA-RSPS-2014-v1) that was done by Millennium Challenge Corporation.
    Version 3.0 (July 2020). Updated version that provides description of the data.

    Version date

    2020-07-29

    Back to Catalog
    IHSN Survey Catalog

    © IHSN Survey Catalog, All Rights Reserved.