IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2013-2018_MCC-RSPS_V01_M / variable [F1]
central

Registry Systems Process Study 2013-2018, Independent Impact Evaluation

Mongolia, 2013 - 2018
Get Microdata
Reference ID
MNG_2013-2018_MCC-RSPS_v01_M
Producer(s)
Innovations for Poverty Action, The Cloudburst Group
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
5926
Downloads
230
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Banking Survey
    Baseline (ENG)
    Public Use
    4_30_2015.dta
  • Back Office
    Time Tracking
    Survey.csv

How many days did it take in total to complete the entire loan process at the b (i5_4_8)

Data file: Banking Survey Baseline (ENG) Public Use 4_30_2015.dta

Overview

Valid: 303
Invalid: 597
Minimum: 0
Maximum: 180
Type: Discrete
Decimal: 0
Start: 628
End: 630
Width: 3
Range: 0 - 180
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 1
0.3%
1 3
1%
2 15
5%
3 30
9.9%
4 17
5.6%
5 40
13.2%
6 1
0.3%
7 59
19.5%
8 7
2.3%
9 1
0.3%
10 42
13.9%
12 1
0.3%
14 29
9.6%
15 10
3.3%
16 1
0.3%
18 2
0.7%
20 12
4%
21 5
1.7%
22 4
1.3%
25 1
0.3%
30 18
5.9%
40 1
0.3%
44 1
0.3%
45 1
0.3%
180 1
0.3%
Sysmiss 597
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.