IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KEN_2019-2021_MMPIE_V01_M / variable [F21]
central

Evaluation of the Mwangaza Mashinani Pilot Project in Kilifi and Garissa Counties, Kenya 2019-2021

Kenya, 2019 - 2021
Get Microdata
Reference ID
KEN_2019-2021_MMPIE_v01_M
Producer(s)
Oxford Policy Management Limited (OPML)
Metadata
DDI/XML JSON
Created on
May 11, 2022
Last modified
May 11, 2022
Page views
38747
Downloads
142
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bl_clean_main
  • bl_clean_incomeroster
  • bl_clean_lightroster
  • bl_clean_memberroster
  • bl_clean_solarroster
  • ml_clean_incomeroster
  • ml_clean_main
  • ml_clean_memberroster
  • el_clean_incomeroster
  • el_clean_lightroster
  • el_clean_main
  • el_clean_memberroster
  • el_clean_solarroster
  • el_clean_solarroster2

What was the MAIN reason the lights were switched off - other specified (MM18O)

Data file: ml_clean_main

Overview

Valid: 7
Invalid: 0
Type: Discrete
Width: 72
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
Battery low 1
14.3%
Delay in paying for the solar caused by technical error 1
14.3%
I don't know because I didn't contact the dlight team(solar provider) 1
14.3%
Low battery due to poor weather caused by lack of enough sun 1
14.3%
Low sun during the day leads to no charging of the solar 1
14.3%
don't know 2
28.6%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.