IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KEN_2019-2021_MMPIE_V01_M / variable [F25]
central

Evaluation of the Mwangaza Mashinani Pilot Project in Kilifi and Garissa Counties, Kenya 2019-2021

Kenya, 2019 - 2021
Get Microdata
Reference ID
KEN_2019-2021_MMPIE_v01_M
Producer(s)
Oxford Policy Management Limited (OPML)
Metadata
DDI/XML JSON
Created on
May 11, 2022
Last modified
May 11, 2022
Page views
38880
Downloads
142
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bl_clean_main
  • bl_clean_incomeroster
  • bl_clean_lightroster
  • bl_clean_memberroster
  • bl_clean_solarroster
  • ml_clean_incomeroster
  • ml_clean_main
  • ml_clean_memberroster
  • el_clean_incomeroster
  • el_clean_lightroster
  • el_clean_main
  • el_clean_memberroster
  • el_clean_solarroster
  • el_clean_solarroster2

Cost to repair the solar device (repair_cost)

Data file: el_clean_main

Overview

Valid: 90
Invalid: 1024
Type: Discrete
Decimal: 0
Width: 6
Range: -99 - 2000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-99 Don't know 69
76.7%
0 Zero- I have a warranty or someone will do it for me for free 6
6.7%
100 1
1.1%
200 2
2.2%
300 1
1.1%
400 3
3.3%
490 1
1.1%
500 2
2.2%
1000 2
2.2%
1500 2
2.2%
2000 1
1.1%
Sysmiss 1024
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.