Value | Category | Cases | |
---|---|---|---|
1 | Repairs outside | 5 |
62.5%
|
2 | Repairs inside | 3 |
37.5%
|
3 | Expand (extension to dwelling) | 0 |
0%
|
4 | Upgrade walls to better material | 0 |
0%
|
5 | Upgrade floor to better material | 0 |
0%
|
6 | Add floor | 0 |
0%
|
7 | Upgrading roofing materials, | 0 |
0%
|
8 | Upgrading windows, | 0 |
0%
|
9 | Adding toilets | 0 |
0%
|
10 | Heightening floor | 0 |
0%
|
11 | Install underground water tank | 0 |
0%
|
12 | Block walls to prevent flood water | 0 |
0%
|
98 | Other | 0 |
0%
|
Sysmiss | 1045 |