IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TZA_2018_RFS_V01_M / variable [F1]
central

Resilience Firm Survey 2018, Dar es Salaam, Tanga and Dodoma

Tanzania, 2018
Get Microdata
Reference ID
TZA_2018_RFS_v01_M
Producer(s)
Alvina Erman, Jun Rentschler, Julie Rozenberg, Stephane Hallegatte
Metadata
DDI/XML JSON
Study website
Created on
Sep 07, 2022
Last modified
Sep 07, 2022
Page views
6504
Downloads
100
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rfs_tanzania_2018

What is the Most important reason for delivery delays by your suppliers? (q4_13a)

Data file: rfs_tanzania_2018

Overview

Valid: 437
Invalid: 400
Minimum: 1
Maximum: 99
Type: Discrete
Decimal: 0
Start: 1972
End: 1973
Width: 2
Range: 1 - 99
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Delayed delivery by their own suppliers 226
51.7%
2 Reliability of transportation (e.g. blocked roads, disrupted 117
26.8%
3 Power outages 8
1.8%
4 Water outages 0
0%
5 Problems in supplier’s company (e.g machine malfunctioning 45
10.3%
6 Labor strike 0
0%
8 No other important reason 0
0%
98 Other 27
6.2%
99 I don’t know 14
3.2%
Sysmiss 400
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.