IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TZA_2018_RFS_V01_M / variable [F1]
central

Resilience Firm Survey 2018, Dar es Salaam, Tanga and Dodoma

Tanzania, 2018
Get Microdata
Reference ID
TZA_2018_RFS_v01_M
Producer(s)
Alvina Erman, Jun Rentschler, Julie Rozenberg, Stephane Hallegatte
Metadata
DDI/XML JSON
Study website
Created on
Sep 07, 2022
Last modified
Sep 07, 2022
Page views
6650
Downloads
100
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • rfs_tanzania_2018

What is the MOST important reason for your delays in delivering to your (q6_8_3a)

Data file: rfs_tanzania_2018

Overview

Valid: 383
Invalid: 454
Minimum: 1
Maximum: 98
Type: Discrete
Decimal: 0
Start: 2558
End: 2559
Width: 2
Range: 1 - 98
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Delayed delivery of your supplies, due to issues with your s 125
32.6%
2 Reliability of transportation (e.g. blocked roads, disrupted 83
21.7%
3 Power outages 78
20.4%
4 Water outages 1
0.3%
5 Problems in your company (e.g machine malfunctioning) 35
9.1%
6 Labor strike 0
0%
7 I have never experienced any delay in delivering to clients 5
1.3%
8 No other second most important reason 0
0%
98 Other 56
14.6%
Sysmiss 454
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.