IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
47836
Downloads
431
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

How much in total did the HH spend on Org_Manure? (ag_12_b_i2)

Data file: lwh_followup3

Overview

Valid: 713
Invalid: 914
Type: Discrete
Decimal: 0
Start: 13126
End: 13135
Width: 10
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 636
89.2%
99 Other 0
0%
100 1
0.1%
500 1
0.1%
1000 1
0.1%
2000 4
0.6%
2100 1
0.1%
2200 1
0.1%
2500 2
0.3%
3000 8
1.1%
3500 1
0.1%
4000 4
0.6%
4500 1
0.1%
5000 12
1.7%
6000 4
0.6%
7000 3
0.4%
7500 1
0.1%
8000 1
0.1%
9000 1
0.1%
9500 1
0.1%
10000 9
1.3%
12000 1
0.1%
13500 1
0.1%
15000 2
0.3%
16000 1
0.1%
20000 6
0.8%
21000 1
0.1%
30000 2
0.3%
35000 1
0.1%
45000 1
0.1%
66600 1
0.1%
75000 1
0.1%
444444444 1
0.1%
999999999 1
0.1%
2147483622 Don't know 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483647 Has data while shouldn't 0
0%
1000000001 Outrange 914
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: How much in total did the HH spend on INPUT? (RWF)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.