IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
47837
Downloads
431
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

Why was less applied than planned? (ag_15_b_i2)

Data file: lwh_followup3

Overview

Valid: 76
Invalid: 1551
Type: Discrete
Decimal: 0
Start: 13208
End: 13217
Width: 10
Range: -88 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 don't know 0
0%
-66 refuse to answer 0
0%
1 insufficient savings 41
53.9%
2 could not secure a loan 0
0%
3 interest rates for credit higher than planned 0
0%
4 prioritized other expenditures 2
2.6%
999 other 33
43.4%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
1001 .B 1551
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: Why was less applied than planned?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.