IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
47872
Downloads
431
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

Total Earned from Public Works Labor (Feb14-Sept14) (lab_04_b)

Data file: lwh_followup3

Overview

Valid: 37
Invalid: 1590
Type: Discrete
Decimal: 0
Start: 14118
End: 14127
Width: 10
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 1
2.7%
99 Other 0
0%
160 1
2.7%
3000 1
2.7%
5000 2
5.4%
7000 1
2.7%
8500 1
2.7%
10000 4
10.8%
14500 1
2.7%
15000 2
5.4%
18000 2
5.4%
20000 2
5.4%
25000 2
5.4%
30000 1
2.7%
33000 1
2.7%
37000 1
2.7%
38000 1
2.7%
40000 1
2.7%
45000 1
2.7%
46000 1
2.7%
50000 1
2.7%
60000 2
5.4%
75000 1
2.7%
100000 2
5.4%
120000 2
5.4%
150000 1
2.7%
260000 1
2.7%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 N/A 1590
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: Total Earned from Public Works Labor (Feb14-Sept14)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.