IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
49963
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

What is max amount saved in Cooperative from Aug 1 2013 - Sept 30 2014? (rf_16_11)

Data file: lwh_followup3

Overview

Valid: 104
Invalid: 1523
Type: Discrete
Decimal: 0
Start: 19140
End: 19149
Width: 10
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 19
18.3%
99 Other 0
0%
100 1
1%
200 6
5.8%
300 3
2.9%
450 1
1%
500 3
2.9%
1000 10
9.6%
1500 1
1%
1600 1
1%
2000 1
1%
2600 1
1%
3000 2
1.9%
4000 2
1.9%
5000 12
11.5%
5550 1
1%
6000 1
1%
7000 1
1%
9000 1
1%
10000 7
6.7%
12000 2
1.9%
15000 4
3.8%
18000 1
1%
20000 4
3.8%
21000 1
1%
25000 1
1%
25700 1
1%
27500 1
1%
30000 3
2.9%
45000 1
1%
50000 1
1%
60000 2
1.9%
75000 1
1%
110000 1
1%
168000 1
1%
200000 1
1%
300000 2
1.9%
350000 1
1%
400000 1
1%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 N/A 1523
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: What is max amount saved in SAVINGS SOURCE from Aug 1 2013 - Sept 30 2014?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.