IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
49868
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

What would the consequence be if you failed to repay this loan? (Other) (crd_21_other3)

Data file: lwh_followup3

Overview

Valid: 43
Invalid: 0
Type: Discrete
Start: 21110
End: 21155
Width: 46
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
. 23
53.5%
Amakimbirane mumuryango 1
2.3%
Bari gutwara umurima 1
2.3%
Bari kwisubiza umurima 1
2.3%
Guhemuka 1
2.3%
Gutakarizwa ikizere 1
2.3%
Gutererwa icyizere 1
2.3%
Kuba umuhemu kuba inyangamugayo bakabimukuraho 1
2.3%
Kujya my manza 1
2.3%
Kumurega 1
2.3%
Kutizerwa 1
2.3%
Ntacyo 1
2.3%
Ntangaruka kuko ntanyandiko mfitanye nawe 1
2.3%
Ntarishyura 1
2.3%
Ukutumvikana numuvandimwe 1
2.3%
Yandega 1
2.3%
Yari kuba abate umuhemu 1
2.3%
Yari kugurisha umurima we 1
2.3%
Yari kundega 1
2.3%
Yari kunjyana mumanza 1
2.3%
Yari kwihangana 1
2.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: What would the consequence be if you failed to repay this loan? (Other)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.