IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
49855
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

What would the consequence be if you failed to repay this loan? (Other) (crd_21_other5)

Data file: lwh_followup3

Overview

Valid: 40
Invalid: 0
Type: Discrete
Start: 21761
End: 21792
Width: 32
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
. 23
57.5%
Guheba ingwate 1
2.5%
Gutererwa ikizere 1
2.5%
Inyungu yari gukomeza kwiyongera 1
2.5%
Kongeraho inyungu 1
2.5%
Kugurisha Umurima 1
2.5%
Kujya mu manza 2
5%
Kujyanwa mu butabera 1
2.5%
Kunjyana mu butabera 1
2.5%
Kutizerwa 2
5%
Narikujyibwaho umugayo 1
2.5%
Niri kwitwa umuhemu 1
2.5%
Ntangaruka 1
2.5%
Ubuhemu 2
5%
Yari kundega 1
2.5%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: What would the consequence be if you failed to repay this loan? (Other)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.