IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
49897
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

What would the consequence be if you failed to repay this loan? (Other) (crd_21_other6)

Data file: lwh_followup3

Overview

Valid: 28
Invalid: 0
Type: Discrete
Start: 22004
End: 22066
Width: 63
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
. 23
82.1%
Kubarega 1
3.6%
Kujyanwa mu rubanza 1
3.6%
Ntayo arishyura ngo azayishyura nyuma yicyumweru 1
3.6%
Ubunyangamugayo bazabumukuraho 1
3.6%
Yari gutanga inyungu kuko yari kuba arengeje igihe basezeranye. 1
3.6%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: What would the consequence be if you failed to repay this loan? (Other)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.