IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
50018
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

Type of Post-Harvest Infrastructure (Other) (crp_27_14a_other1_2)

Data file: lwh_followup3

Overview

Valid: 291
Invalid: 0
Type: Discrete
Start: 3838
End: 3872
Width: 35
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
. 274
94.2%
Akadobo 1
0.3%
Gusuka hasi 1
0.3%
Hasi 2
0.7%
Hasi kubutaka 1
0.3%
Hasi mu nzu 1
0.3%
Hasi munzu 1
0.3%
Indobo 1
0.3%
Kubimena hasi 1
0.3%
Mubwanikiro bwa coop'ya kotuabiki 1
0.3%
Mugatebo 1
0.3%
Mukajerekani 1
0.3%
Munzu hasi 1
0.3%
Yabirunze muri salon 1
0.3%
Yabisukaga hasi kugirango bitabora 1
0.3%
Yabisutse hasdi kugira NGO bitabora 1
0.3%
Yabisutse hasi kugira ngo bitabora 1
0.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: Type of Post-Harvest Infrastructure (Other)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.