IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
49907
Downloads
432
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

Why was the harvested amount zero? (Other) (crp_08_0_14a_other2_3)

Data file: lwh_followup3

Overview

Valid: 79
Invalid: 0
Type: Discrete
Start: 4960
End: 5000
Width: 41
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
. 67
84.8%
Byangijwe nizuba 1
1.3%
Byishwe ni zuba 1
1.3%
Habuze imvura ntibyera 1
1.3%
Izuba 3
3.8%
Izuba ryinshi 1
1.3%
Kurandurwa 1
1.3%
Kurumba kubera izuba 1
1.3%
Kurumba kubera izuba nudusimba 1
1.3%
Sun 1
1.3%
Yarabiranduye kuberako byicaga ibishyimbo 1
1.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: Why was the harvested amount zero? (Other)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.