IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2014_LWHIE-F3_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2014, Third Follow-up Survey

Rwanda, 2014
Get Microdata
Reference ID
RWA_2014_LWHIE-F3_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
47684
Downloads
430
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup3

Total Spent on Hired Labor for [land preparation and planting] (ag_18_x_14a)

Data file: lwh_followup3

Overview

Valid: 360
Invalid: 1267
Type: Discrete
Decimal: 0
Start: 6867
End: 6876
Width: 10
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 2
0.6%
99 Other 0
0%
350 1
0.3%
700 2
0.6%
800 6
1.7%
1000 3
0.8%
1400 8
2.2%
1600 7
1.9%
1800 1
0.3%
2000 8
2.2%
2100 5
1.4%
2400 12
3.3%
2500 2
0.6%
2800 9
2.5%
3000 24
6.7%
3200 7
1.9%
3400 1
0.3%
3500 5
1.4%
3600 1
0.3%
3800 1
0.3%
4000 26
7.2%
4200 6
1.7%
4500 3
0.8%
4800 7
1.9%
4900 4
1.1%
5000 34
9.4%
5600 5
1.4%
5700 1
0.3%
6000 25
6.9%
6300 1
0.3%
6400 3
0.8%
6700 1
0.3%
7000 19
5.3%
7200 1
0.3%
7500 1
0.3%
7700 2
0.6%
8000 34
9.4%
8100 1
0.3%
8200 1
0.3%
8400 5
1.4%
8500 1
0.3%
8600 1
0.3%
8700 1
0.3%
8800 1
0.3%
9000 5
1.4%
9500 1
0.3%
9600 5
1.4%
10000 60
16.7%
2147483622 Don't know 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483647 Has data while shouldn't 0
0%
100001 Outrange 1267
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Question text: Total Spent on Hired Labor for [land preparation and planting]
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.