IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MOZ_2016-2019_SLWRMPIE_V01_M / variable [F2]
central

Impact Evaluation of the Sustainable Land and Water Resource Management Project 2016-2019

Mozambique, 2016 - 2019
Get Microdata
Reference ID
MOZ_2016-2019_SLWRMPIE_v01_M
Producer(s)
Paul Christian
Metadata
DDI/XML JSON
Study website
Created on
Oct 12, 2023
Last modified
Oct 12, 2023
Page views
337769
Downloads
483
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • com_baseline
  • hh_baseline
  • com_midline
  • hh_midline
  • kit_midline
  • com_endline
  • hh_endline
  • kit_endline

Qual é o método de obtensão da água na machamba nos últimos 12 meses? (plotirrmethod_5)

Data file: hh_baseline

Overview

Valid: 1
Invalid: 1386
Minimum: 2
Maximum: 2
Type: Discrete
Decimal: 0
Width: 17
Range: 2 - 2
Format: Numeric

Questions and instructions

Categories
Value Category Cases
2 Balde de mão 1
100%
-9 Outro 0
0%
1 Gravidade 0
0%
3 Bomba de mão/pé 0
0%
4 Motobomba 0
0%
d Don't know 0
0%
o Other 0
0%
r Refused to answer 0
0%
Sysmiss 1386
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.