IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2023_WBCS_V01_M / variable [F1]
central

World Bank Group Country Survey, 2023

Mongolia, 2023
Get Microdata
Reference ID
MNG_2023_WBCS_v01_M
Producer(s)
Public Opinion Research Group
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 27, 2024
Last modified
Feb 27, 2024
Page views
4911
Downloads
188
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_cos_fy23_data

Transport: roads, bridges, railways, air transport capacity, sustainable transportation (B3_1)

Data file: mongolia_cos_fy23_data

Overview

Valid: 300
Invalid: 7
Minimum: 1
Maximum: 11
Type: Discrete
Decimal: 0
Width: 20
Range: 1 - 11
Format: Numeric

Questions and instructions

Literal question
How EFFECTIVE has the WBG been in achieving development results in each of these areas of infrastructure in Mongolia?
Categories
Value Category Cases
1 Not effective at all 4
1.3%
2 4
1.3%
3 11
3.7%
4 8
2.7%
5 19
6.3%
6 30
10%
7 27
9%
8 28
9.3%
9 12
4%
10 Very effective 20
6.7%
11 137
45.7%
Sysmiss 7
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.